Trash Full Capture Device Installation (MI 2597)

Print
Press Enter to show all options, press Tab go to next option

 

Trash Full Capture Device Installation (MI 2597)

 PROJECT DESCRIPTION

  • The project location will be at various locations. (see Vicinity Map)
  • The works include the fabrication and installation of full capture trash control devices at 42 high-priority catch basins locations throughout the City (see Vicinity Map). Related work also includes pre-installation cleaning and disposal of waste such as debris, dirt, and residual metal scraps from selected catch basins.

PROJECT TIMEFRAME

July 2021 – August 2021 (Estimated) to last for 55 Calendar Days

BUDGET/FUNDING (HOW MUCH/FROM WHO)

A construction contract has been awarded to United Storm Water, Inc. (City of Industry, CA) in the amount of $65,252.94. This project is funded with Stormwater Funds.

PROJECT HIGHLIGHTS/BENEFITS

The combination of an exterior screening device and a secondary interior screen (connector pipe screen, CPS) works together to effectively reduce the amount of trash entering the storm drain system. Catch basins previously retrofitted in this manner are considered to be in full compliance with the State’s trash and litter water quality requirements.

MAP OF PROJECT AREA

Unit W Vicinity Map 

PROJECT IMPACTS

Partial lane closure adjacent to the catch basins to receive the trash control devices or screens.

 

PROJECT MANAGER/CONTACTS

Gareth Madrid
Project Manager
gmadrid@toaks.org
805-449-2469

Michael Fahrenkopf
MSC – Street Maintenance Supervisor
MFahrenkopf@toaks.org
(805) 376-5082

Clark Mendoza
MSC – Street Maintenance Staff
CMendoza@toaks.org
805-449-2499

Elaine Camia
Associate Engineer
ECamia@toaks.org
805-449-244