PROJECT DESCRIPTION
- The project location will be at various locations. (see Vicinity Map)
- The works include the fabrication and installation of full capture trash control devices at 42 high-priority catch basins locations throughout the City (see Vicinity Map). Related work also includes pre-installation cleaning and disposal of waste such as debris, dirt, and residual metal scraps from selected catch basins.
PROJECT TIMEFRAME
July 2021 – August 2021 (Estimated) to last for 55 Calendar Days
BUDGET/FUNDING (HOW MUCH/FROM WHO)
A construction contract has been awarded to United Storm Water, Inc. (City of Industry, CA) in the amount of $65,252.94. This project is funded with Stormwater Funds.
PROJECT HIGHLIGHTS/BENEFITS
The combination of an exterior screening device and a secondary interior screen (connector pipe screen, CPS) works together to effectively reduce the amount of trash entering the storm drain system. Catch basins previously retrofitted in this manner are considered to be in full compliance with the State’s trash and litter water quality requirements.
MAP OF PROJECT AREA
PROJECT IMPACTS
Partial lane closure adjacent to the catch basins to receive the trash control devices or screens.
PROJECT MANAGER/CONTACTS
Gareth Madrid
Project Manager
gmadrid@toaks.org
805-449-2469
Michael Fahrenkopf
MSC – Street Maintenance Supervisor
MFahrenkopf@toaks.org
(805) 376-5082
Clark Mendoza
MSC – Street Maintenance Staff
CMendoza@toaks.org
805-449-2499
Elaine Camia
Associate Engineer
ECamia@toaks.org
805-449-244